Campus Traffic Detours

 

ADA Path of Travel project:  An ADA path of travel project will begin this week and continue through June 30th.  The scope includes removal and replacement of existing concrete in numerous locations throughout campus. The red text below indicates closures that will disrupt ADA parking and accessibility. To see parking map of ADA parking areas, go to: http://oregonstate.edu/campusmap then click on the parking tab at the top of the page.
All of the listed work locations and schedules are weather dependant.
Closures and delays include:

  1. The parking on 26th Street across from the Women’s Building will be closed from June 3rd through approximately June 30th.
  2. The Memorial Place parking lot between Milam Hall and Gilkey Hall will be closed June 10th through June 30th.
  3. Jefferson Street will be closed between 15th and 26th Streets for resurfacing June 14th through June 18th  during which there will be no access to the Central Campus Metered lot (Bookstore). This closure will also include a substantial traffic re-direction at the intersection of Benton Place and Jefferson Streets.
  4. There will also be some major sidewalk renovations to the sidewalk on the north side of the Memorial Union. Closures and delays can be expected after June 12th
  5. Intermittent traffic delays and/or brief interruptions in service for both vehicles and pedestrians will be experienced between June 10th though June 30th in the following locations:
    1. 26th Street between Jefferson Street and Monroe street
    2. The parking lot north of Bates Hall
    3. The parking lot north of Burt Hall
    4. Benton Place between Washington Way and Jefferson Street
    5. Campus Way between the intersection of 26th  to Memorial Place.

Fencing and signage will be used for safety, and to direct traffic.

ADA Path of Travel project:  An ADA path of travel project will begin this week.  The scope includes removal and replacement of existing concrete in numerous locations throughout campus.  Fencing and signage will be used for safety, and to direct traffic.  The west bound vehicular traffic on Jefferson Street, west of Waldo Place will be closed Friday, June 4th through Sunday June 6th, weather permitting.

Jefferson Way Resurfacing Project:  Jefferson Way, between 15th and 26th Streets will be closed to vehicular traffic during the week of June 14th through June 18th, weather permitting.  The project scope includes repairing the street and providing a new asphalt surface.

Replacement of the intersection of Jefferson Street and 26th street will begin on Wednesday June 23rd. On Wednesday expect partial closures and delays as the old concrete is removed. Beginning Thursday the entire intersection will be closed as the new concrete is placed. It will remain closed until early Monday June 28th to allow for proper curing time.

View Summer 2010 Major Construction Map